When falling rocks must be stopped
On many slopes it is impossible to stop rocks from detaching: the release zone is too high, the slope area too large, or installation on it is not possible. A rock accelerates, bounces off ledges and reaches the protected object with enormous energy. A barrier is placed in the path of the falling block and stops it before it reaches the object.
  • Steep ledges, large blocks
    Characterized by the release of large blocks, made worse by sharp edges and load concentration at the point of impact on the barrier.
  • High (long) scree slopes
    Characterized by mass failures and distributed loads on the barrier elements. The barrier fills up with debris quickly.
How we select a barrier
We analyse the boundary conditions of the project (geology, topography, seismicity, deformation tolerances, drainage, etc.) and propose several technical solutions for one problem. Based on the client's wishes and budget, the solution with the best balance of effectiveness and cost is selected. Where needed, solutions come with proposals from partners for design and installation.
  • Flexibility instead of rigidity
    Mesh, cables and posts work as one system: they take the impact, stretch and smoothly absorb the rock's energy. That is why a flexible barrier withstands loads under which rigid walls fail.
  • Energy-absorbing elements
    Impact energy is absorbed by brake elements on the cables, so much smaller forces are transferred to the anchors and foundations.
  • Tested at full scale
    Barriers are tested under real conditions at full scale. The rated energy is proven by testing, not just by calculation: for design you only need the maximum bounce height of the debris and the rockfall energy at the barrier location.
  • Dimensioning
    We determine the barrier energy and height from rockfall trajectory modelling on the specific slope. The rockfall energy range is up to 12,500 kJ. We can carry out the calculation ourselves using the client's data.
Materials and technologies
We use best-in-class technologies and materials for rockfall barriers.
  • RXE-12500 barrier tested with a 12,500 kJ impact
    Geobrugg systems and meshes
    Unmatched strength and reliability for any impact energy. Extremely resistant to shearing.
  • Ischebeck TITAN self-drilling anchor
    TITAN anchors
    The pioneers of self-drilling grouted anchor technology and the only micropiles certified for permanent structures.
  • Geobrugg wire rope anchor with FlexHead
    Geobrugg wire rope anchors and FlexHead heads
    Flexible anchors for fixing the retaining cables. Resistant to a direct hit by falling rock.
With you from start to finish
Our workflow has six main steps: data collection, analysis and concept, calculations and material selection, supply, site supervision and maintenance.

Data collection

Most often we can estimate the whole budget from photos and a WhatsApp message. We are also glad to review other materials: geological, topographic and DEM data, information about the protected asset and the planned budget. In complex cases we can visit the site with you and collect the data we need on the spot.
Analysis and concept
You probably know what you need, and we are happy to hear your ideas. If you face difficulties, need a second opinion or are not yet familiar with our technologies, we develop the geotechnical concept and discuss several options with you, including the schedule and budget of each.
Calculations and material selection
Once the data are collected and the protection concept is chosen, we move on to detailed calculations and the selection of specific materials. At this stage everything is about details: input data, assumptions, technical specifications and cost.
Supply of materials
We do not just ship materials directly from the factories: we personally know everyone who manufactures, packs, ships and transports them. At every stage we work closely with our partners to ensure the fastest and most cost-effective delivery for our clients.
Site supervision
Installation is carried out by our partners. Any contractor can become one if they have the necessary equipment and strictly follow our installation manuals. We monitor compliance with our recommendations, but we prefer to help rather than police: together with our partners and clients we find the best solution for any situation, drawing on our international team and years of experience.
Maintenance
For most of the technologies we use, maintenance will not be needed for decades. But if it ever is, we are always there.
Examples of completed projects
For your inspiration
Frequently asked questions