When conventional support is not enough
Many mines rely on standard ground support. Sometimes this is just rock bolts, but bolting alone is often not enough to secure an excavation reliably. Bolts hold the rock mass by creating an arching effect, yet weakened rock can still fall out between them, and during a rockburst the damaged zone can extend deeper than the bolt length. In these cases the reliability of the support depends on the surface support that ties the bolts into a single system.

Conventional surface support solutions have serious drawbacks:

  • Welded mesh and steel cages slow down development. Sheets and cages are delivered and hung by hand or with auxiliary equipment, the bolter often stands idle, and people work under unsupported ground. Welded mesh sheets are also heavy and cover a very small area, so their geometry alone forces tighter bolt spacing or leaves part of the roof uncovered. Their energy capacity often does not match real loads, especially for falls of ground after seismic events and rockbursts.
  • Steel arch sets and shotcrete require large volumes of steel and concrete, complex logistics and long installation times. They are often used where the task could be solved more simply.
Reinforced combined support with bolts and high-tensile mesh can fully or partly replace these solutions. High-tensile mesh absorbs far more energy than welded mesh, is installed mechanically and reduces shotcrete and steel consumption. The rules on the stability of underground excavations explicitly provide for combined support with flexible high-tensile mesh as an alternative to steel arch support for a number of excavation categories.
  • Fall of ground
    Rock falling from the roof and walls of an excavation. It depends on geological conditions rather than depth. The load on the support is quasi-static, but a fall of ground often follows a seismic event or blasting
  • Rockburst
    Sudden brittle failure of the rock mass under high stress, ejecting rock into the excavation. The hazard usually grows with depth, and the support takes a very high dynamic load
Our support has no weak link
We analyse the rock mass, the development method and the available equipment, and select the best solution
  • High-tensile mesh instead of welded mesh
    MINAX mesh made of wire with a tensile strength of at least 1,770 N/mm² carries high static and dynamic loads with little deformation
  • Dynamic bolts
    GE and GB bolts elongate during a rockburst or squeezing and absorb energy while remaining anchored in the rock mass
  • Correct load transfer
    The G-Plate transfers the load from the mesh to the bolt so that the mesh works at its full capacity
  • Testing the whole system
    The support is tested as a whole (bolt, plate, nut, mesh), not element by element. A chain is only as strong as its weakest link.
  • Miners stay out of the danger zone
    The MESHA attachment lets the bolter hang the mesh, with no manual work under unsupported ground
Materials and technologies
We use best-in-class technologies and materials for underground ground support.
  • Manual installation of MINAX 80/4 mesh in a mine
    MINAX mesh
    Diamond-shaped woven mesh of high-tensile steel wire for surface support. The ends are knotted: no weak points or sharp edges, and minimal overlap. Light, compact rolls suit both manual and mechanized installation. Supercoating zinc-aluminium coating and edge corrosion protection ensure a long service life
  • Geobrugg G-Plate bearing plate
    G-Plate
    A bearing plate designed for high-tensile mesh. It ensures optimal load transfer from the mesh to the bolt and increases the capacity of the support and its resistance to blast loads
  • MESHA handler unrolling MINAX mesh
    MESHA attachment
    An attachment for mechanized installation of rolled mesh. It fits bolters from all major manufacturers and is in use at mines in Chile, Mexico, Canada, South Africa, Spain, Brazil, Turkey, Australia, Peru and Russia
  • Geobrugg GE-bolt and GB-bolt dynamic bolts
    GE and GB dynamic bolts
    A smooth steel bar bolt with one (GE) or two (GB) anchoring points. During a rockburst or squeezing, the smooth sections of the bar elongate and absorb energy. Installed with resin cartridges or cement grout. Diameters 20, 22 and 25 mm. The GE bolt is supplied with a G-Plate.

MINAX: comparison table

(With the G-Plate the capacity is higher thanks to better load transfer)

GE and GB dynamic bolts

Mechanized installation with the MESHA attachment
Rolls instead of sheets: faster and safer! With welded mesh, the operator manually feeds up to 20 sheets per round and stays in the danger zone the whole time. With MINAX rolled mesh and the MESHA attachment, one roll per round is hung by the bolter, and nobody goes under unsupported ground.

Results at a mine that adopted MESHA:
  • Faster development with higher reliability
    Up to 25% of bolting time used to be lost on delivering and installing welded mesh
  • Savings
    Time savings of 2.5–3.5 hours per shift, or up to 33% of bolting time
  • Streamlined logistics
    From 3–5 mesh deliveries to the face per shift down to one every 14 shifts
Support design to Kazakhstan standards and international practice
We select and design support in line with the building codes of the Republic of Kazakhstan:
  • SN RK 2.03-04-2013 "Underground Mine Workings" — requirements for the design, driving and support of excavations
  • SP RK 2.03-106-2013 "Underground Mine Workings" — rock stability analysis, support loads, selection of support type and support design
  • SP RK 2.03-103-2013 "Protection of Mine Workings from Groundwater and Surface Water" — accounting for water inflow, which reduces rock mass stability and accelerates corrosion of support elements
National codes do not cover excavations in zones of elevated tectonic stress. That is exactly where rockbursts occur and dynamic support is needed. For these conditions we apply methods accepted in international mining practice:
  • support design based on the energy it must absorb during a seismic event
  • system selection by the weakest link: surface support must absorb energy on a par with the bolts
  • the requirement that surface support deform by at least 200 mm without failure
  • testing the complete support system rather than individual elements
According to published full-scale test data, welded mesh of 5.6 mm wire absorbs about 1.3 kJ/m². High-tensile woven mesh of 4 mm wire absorbs about 6.5 kJ/m² and deforms up to 300 mm without failure.
Corrosion protection matters in wet excavations. MINAX mesh has a zinc-aluminium coating and edge protection.
With you from start to finish
Our workflow has six main steps: data collection, analysis and concept, calculations and material selection, supply, site supervision and maintenance.

Data collection

Most often we can estimate the whole budget from photos and a WhatsApp message. We are also glad to review other materials: geological, topographic and DEM data, information about the protected asset and the planned budget. In complex cases we can visit the site with you and collect the data we need on the spot.
Analysis and concept
You probably know what you need, and we are happy to hear your ideas. If you face difficulties, need a second opinion or are not yet familiar with our technologies, we develop the geotechnical concept and discuss several options with you, including the schedule and budget of each.
Calculations and material selection
Once the data are collected and the protection concept is chosen, we move on to detailed calculations and the selection of specific materials. At this stage everything is about details: input data, assumptions, technical specifications and cost.
Supply of materials
We do not just ship materials directly from the factories: we personally know everyone who manufactures, packs, ships and transports them. At every stage we work closely with our partners to ensure the fastest and most cost-effective delivery for our clients.
Site supervision
Installation is carried out by our partners. Any contractor can become one if they have the necessary equipment and strictly follow our installation manuals. We monitor compliance with our recommendations, but we prefer to help rather than police: together with our partners and clients we find the best solution for any situation, drawing on our international team and years of experience.
Maintenance
For most of the technologies we use, maintenance will not be needed for decades. But if it ever is, we are always there.
Examples of completed projects
For your inspiration
Frequently asked questions
Request information
Fill in the form and we will contact you soon.
Contacts
info@geostein.kz
+7 (771) 775 28 38